Our GHD range is specially designed to join copper alloy tube that require higher pressure and temperature work ratings compared to the standard solder fittings. They are manufactured to BS1400.
We hold a good selection of stock on standard GHD’s, anything out with a 7-14 day turnaround. MHD’s are made to order, working on a 7-14 day turnaround.
Like our ABCO Large size compression fittings all our flanges are designed and manufactured in the UK with the highest quality of metals.